Solar installations
Become energy self-sufficient by installing photovoltaic panels integrated with a battery storage system.
Photovoltaic installation
with energy storage system
Execution
- Installation of scaffolding
- Installation of panels, inverter, and battery by our team of experts
- AC and DC connections by licensed electricians
Control and commissioning
- Inspection of your installation by an independent body
- Delivery of technical sheets
- Pronovo application for federal grant
FAQ
An installation is done in three main phases:
- Planning : roof assessment, on-site visit, layout plan, announcements to the municipality and the network operator, then site planning.
- Execution : assembly of scaffolding, installation of panels, inverter, and battery, AC and DC connections.
- Inspection and commissioning : inspection by an independent body, delivery of technical sheets and warranties, application for federal grant.
Yes, work must generally be announced to the municipality. Depending on the canton and the type of building, a permit procedure may apply. The connection to the grid must also be announced to the local network operator. These steps are usually handled by the installer.
Installing on the roof of a single-family home generally takes a few days. The complete project, from the first visit to commissioning, lasts several weeks to a few months. This timeframe is mainly due to administrative procedures and obtaining permits. The exact timeline depends on the size of the project and the availability of materials.
A battery stores the electricity produced during the day for use in the evening or at night. It increases the self-consumption rate and reduces electricity purchases from the grid. It also provides better protection against rising electricity prices. It is the key to getting closer to energy independence.